A major midstream energy company replaced its legacy SONET network with a modern Ethernet/IP architecture using JumboSwitch® platforms. The upgrade increased bandwidth from 1.544 Mbps to 1 Gbps, reduced leased T1 costs, and strengthened long-term SCADA scalability.
This case study explains how TC Communications enabled a seamless, phased migration to fiber-based Ethernet.
Learn more about the JumboSwitch
Tags: